New Factory IT Construction Checklist (2026 Edition)
Complete Coverage from Planning to Production

When building a new factory, 90% of attention goes to production lines, facilities, and equipment. But if IT isn't ready, launch day becomes a nightmare: network not connected, systems not installed, monitoring not configured—production lines sit idle.

This article provides a complete checklist based on 20+ years of manufacturing IT construction experience, helping you avoid 90% of common pitfalls.

Core Principle: IT and Production Line "Three Synchronizations"

The core principle of new factory IT construction is "synchronized planning, synchronized construction, synchronized launch." IT is not an afterthought—it must be planned from Day 1 alongside the production line.

Phase 1: Requirements Analysis (3-6 months before construction)

IT team engagement: understand production line plans, equipment lists, system requirements

Phase 2: Solution Design (2-4 months before construction)

Network topology, data center location, low-voltage planning, security architecture

Phase 3: Parallel Construction (during construction)

Cabling, equipment installation, system commissioning in parallel with civil works

Phase 4: Integration & Launch (1-2 months before production)

System integration, stress testing, staff training

Checklist 1: Network Planning

☐ Network Architecture

💡 Experience: Production network and office network must be physically or logically isolated (VLAN + firewall). This is the foundation of industrial control security.

Checklist 2: Security Architecture

☐ Network Security

☐ Data Security

☐ Compliance Requirements

Checklist 3: Data Center Construction

☐ Data Center Environment (reference GB50174-2017)

☐ Environmental Monitoring

Checklist 4: Low-Voltage Systems

☐ Low-Voltage Planning

Checklist 5: System Planning

☐ Core Systems

💡 Experience: System selection must consider 3-5 years of growth, not just current needs. Once ERP/MES goes live, replacement costs are extremely high.

Timeline Reference

Factory Size IT Planning Cycle Construction Cycle
Small (<10,000㎡) 1-2 months 2-3 months
Medium (10,000-50,000㎡) 2-3 months 4-6 months
Large (>50,000㎡) 3-6 months 6-12 months

About Yungu

Suzhou Yungu provides one-stop new factory IT services:

Get the complete "New Factory IT Checklist" for free—contact us today.

Need Professional Support for New Factory IT Planning?

20+ years of manufacturing IT construction experience. Avoid 90% of common pitfalls.

Get Free Checklist →