R&D Cloud

Launch Your R&D Design Environment in 30 Days

No server purchase, no ops team to build, software licenses allocated on demand

Book a Free Solution Assessment

Three Pain Points in Building an R&D Environment

Slow R&D environment rollout

Building a data center takes 3–6 months; projects can't wait that long.

CAD licenses: too many waste money, too few fall short

Per-seat purchasing is costly, while over-deployment carries compliance risk.

Risk of R&D drawing data leakage

Storing core drawings on public cloud fails compliance requirements.

Solution: On-Premise Cloud

The on-premise cloud deploys cloud resources locally within the enterprise while the provider handles full-managed delivery — combining private-cloud data security with public-cloud elasticity and zero-ops convenience.

Dimension Self-built private cloud On-premise cloud (recommended) Public cloud
Upfront costHeavy (CAPEX)Annual/quarterlyPay-as-you-go
Time to launch3–6 months~30 daysFast
OperationsOwn team requiredFully managedCloud provider
Data locationOn-siteOn-site, within compliance zoneCross-border risk
ElasticityPoorScalableGood

① Need to launch an R&D environment within 3 months?

② Lacking a mature IT operations team?

③ Want to avoid large upfront investment while keeping scalability?

Meeting 2 or more → on-premise cloud recommended

Four Core Capabilities

① Design resource subscription

3D design, mainstream CAD, and collaboration tools, subscribed on demand.

② Network floating license acceleration (WLC500)

Dynamically allocates licenses and improves software asset utilization — addressing the "too many or too few licenses" pain point.

③ R&D data resource subscription

High-performance storage and unstructured data management.

④ Simulation resource subscription

CAE simulation computing power that shortens engineering cycles by 30%+.

Technology Foundation

Cloud Valley partners with Cloud4China (Longsiyun) to deliver services on its WiseCloud on-premise cloud platform.

  • The platform serves 3,000+ manufacturing enterprises and 320,000 engineers
  • Longsiyun's core team comes from CAD/CAE software companies and advanced enterprise R&D departments
  • A regional service center in Suzhou enables local response

Customer Cases

A precision components manufacturer

A 30-person R&D team with peak concurrency of 28; license optimization cut costs by 40%.

An equipment manufacturing enterprise

Self-build stalled for 3 months; switching to on-premise cloud delivered in 30 days.

FAQ

What is the difference between on-premise cloud and private cloud?

On-premise cloud deploys cloud infrastructure within the enterprise's local compliance zone with full-managed operations by the provider; private cloud typically requires self-building and self-operating. On-premise cloud keeps data on-site while converting upfront purchases into annual/quarterly payments.

Where is the data stored? Does it leave the factory?

Data resides in the local compliance zone; core R&D drawings stay within the factory to meet compliance and information-security requirements.

How are licenses allocated on demand?

Via WLC500 network floating license acceleration, licenses are dynamically assigned to active engineers — purchased by concurrent use rather than per seat — improving software asset utilization.

How long does launch take?

The on-premise cloud model typically delivers in about 30 days, far faster than the 3–6 months of a self-built data center.

How is it priced?

Billed annually or quarterly, with flexible pricing based on compute, storage, and license subscription scale — avoiding large one-time investment.

Ready to launch your R&D environment in 30 days?

Contact us for a free R&D cloud solution assessment

Book a Free Solution Assessment